• Facebook
  • White Google+ Icon
Search
  • DMC Electrical & Energy

So you were told you can't have solar because of steep pitch?

Updated: Feb 16

Very normal, can't blame a tradesperson who usually gets paid the same either way to want to work on one.

This roof was probably the most difficult install I've ever seen completed. Many companies had gotten there before us and simply driven off when they saw the site. Unfortunately for the poor customer they lost their deposit a couple of times to as they didn't check the fine print.😢

But with perseverance and an incredible effort from our people, it was finally able to be done.

What you can't see from the photo is the 5 story drop behind them and the 4 stories of the house. A truly remarkable accomplishment!


5 views0 comments

Recent Posts

See All

As a team, we've been together for around 10 years now

We've literally built the largest companies in Australia within our industry, through to the small, boutique, and highly revered operators. It taught us a lot of things. Things such as, keep small eff

Leaks

humm-logo.png
Our installs are done By Hand-picked, exclusive to DMC only, CEC accredited installers Under these license​s:
Solar LIC: 
A4227659 Jim Maslin
A7561680 Aaron Mcmenemy

Contact Us Now

© 2023 by DMC Electrical & Energy.